Tuesday, 11 March 2014
Tudor Apothecary Shop Building
It might not look like great progress, but the subfloors are in, the interior is painted, and the ceiling beams are in place, as well as the planked floor, which we will leave removable in case I have to hide wiring. At the moment, the main beam on the street side of the shop building is being glued in place, to be followed by a series of stub beams. Then I get to work staining lots and lots of beams to decorate the outside walls with.
Check back in tomorrow, hopefully I can show some outside progress. We have had snow much of the day, and are expecting a storm with 20-25cm (8-10") of snow in the course of Wednesday!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment