Friday, 12 February 2021
The Back Wall Is In Place!
Wednesday, 3 February 2021
What Happens If You Don't Think
This morning, I tested the long slanted roof section of the wooden shoe factory, after having finally glued in the buttresses and the toilet block. The roof section wouldn't fit! Scratching my head, I decided I didn't think ahead well enough; the thickness of the paper clay stucco on the hallway wall took up a good 1/8" of space (approx. 3 mm) . Not a huge measurement in the common run of things, but it makes a big difference in 1/12th scale!
Scary! I had to trim back the finished stucco, and hope I didn't chip things too badly. It is all to the better that I discovered this now, as I will have to do the same thing in the corner of the workshop, and it would have been a lot more difficult to chip away in that confined space. The dividing wall hasn't been glued in place yet, as I still have to do the "clay" floors. It was, therefore, fairly easy to lay it flat on my worktable and slice and sand away.
Wednesday, 27 January 2021
Wooden Shoe Workshop Progress Report
Two of us managed to get together on-line today for a miniature meeting. During the meeting, I dirtied up the hallway and sink area, fitted up the window, and added the faucet.
Saturday, 23 January 2021
Working Away!
With the drying times involved here, it is going a little slower than I had hoped. However, I am still plugging away at the Klompenfabriek, and here are a few progress photos. The photo above is of the clay freshly applied to the wall, with a skewer keeping the hole for the faucet free of clay. As everything is quite wet here, I set the wall down flat on my table (the Lego bricks keep the screws from scratching the table surface.) The tools to the right are what I used to texture and shape the clay; my knife, a rubber-tipped sculpting tool, and a brass bristle brush. The latter is used to make the tiny pits in the wet clay that make it look like stucco.
(If you enlarge the photo, you can see some rather linear pits, upwards and to the right of the brick section. This was removed using my fingers, and then re-pitted using the small end of the brush. Photos are super for showing you what needs fixing....)